Day 3 Wednesday 24 July 2013

We experienced difficulties with the videoconnection which is needed for communication with the control room. 
Also the small panels required a lot of time. Nevertheless, we finished PentiDisc up to the 6 suspension points.
We tested the electrical circuitry and measured a lifting speed of 15.5 cm/sec.

Paul Hildebrandt, Marieke van der Wegen, Dirk Korte and Jim Hausman

In the picture, the steelwires for the three-point suspension system are visible.

 

In the evening, Dirk, Jim and Paul van de Veen did another 70 C panels. Instead of 220 now only 150 to finish!
We also checked and finished work on a cabled video connection.

 

A time-lapse video made by Paul Hildebrandt with the subscript
"A day in which we add the first blue panels to the Pentidisc sculpture, designed by Fabien Vienne, to be installed at the Saxion University, Enschede, the Netherlands.
Workers include Paul van de Veen, Jim Hausman, Samuel Verbiese, Marieke van der Wegen, Dirk Korte and Harry & Paul Hildebrandt"